Is MonkeyCode production-ready?
The published minimums are an evaluation floor and there are open issues, so treat production readiness as something you validate for your environment rather than assume.
Run a bounded pilot covering isolation, model routes, failure recovery, upgrades, and capacity before standardizing on it for critical work.
| Published minimums | An evaluation floor, not a guarantee |
|---|---|
| Open issues | Exist in the public tracker |
| Readiness | Validate for your environment |
| Method | Bounded pilot before critical use |
Run a pilot covering isolation, model routes, failure recovery, upgrades, and capacity before standardizing.